Commissioning
4.5 Commissioning with STARTER
Inverter with CU240B-2 and CU240E-2 Control Units
74 Operating Instructions, 01/2011, FW 4.4, A5E02299792B AB
Wizard for basic commissioning
The wizard guides you step-by-step through the basic commissioning.
In the first step of the wizard,
select the control mode.
If you are not certain which
control mode you require for your
particular application, then select
U/f control for the time being.
Help on how to select the control
mode is provided in Chapter
Motor control (Page 168).
In the next step, select the assignment of
the converter interfaces (see also Section:
Select interface assignments (Page 46)).
Rema
rk: The possible settings of your
Control Unit can deviate from those in the
diagram.
In the next step, select the application for the converter:
Low overload for applications that only require a low dynamic performance, e.g.: Pumps
or fans.
High overload for applications requiring a high dynamic performance, e.g. conveyor
systems.
In the next step, enter the motor data according to the rating plate of your motor.
The motor data for SIEMENS standard motors can be called in STARTER based on their
order number.
In the next step, we
recommend the setting
"Identify motor data at
standstill and with the motor
rotating".
If the motor cannot freely
rotate, e.g. due to a
mechanically limited travel
section, then select the
"Identify motor data at
standstill" setting.
In the next step, set the most important parameters that match your application, e.g. the
ramp-up and ramp-down time of the motor.