Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2011, FW 4.4, A5E02299792B AB
3
Change history
Important changes with respect to the manual, edition 07/2010
New functions in firmware V4.4 In Chapter
Predefined settings for the interfaces of the converter
Installing Control Unit (Page 42)
Two- and three-wire control via terminal block
Inverter control (Page 149)
Unit changeover
Application-specific functions
(Page 182)
Expanded options for controlling DC braking
Braking functions of the inverter
(Page 187)
Expansion of the automatic restart with the addition of a new
mode
Automatic restart and flying restart
(Page 204)
Trace via STARTER
Commissioning with STARTER
(Page 71)
Revised descriptions In Chapter
The description of the Power Module PM240-2 and PM250-
2 has been removed. The release of this Power Module is
scheduled to be with firmware V4.5.
Installing the Power Module
(Page 30)
Technical data, Power Modules
(Page 266)
Wiring the terminal strip
Installing Control Unit (Page 42)
Adapt terminal strip (Page 89)
Settings of the USB interface for commissioning with
STARTER.
Commissioning with STARTER
(Page 71)
Slave-to-slave communications via PROFIBUS DP
Communication via PROFIBUS
(Page 102)
Application Examples (Page 279)
Acyclic communication via PROFIBUS DP (data set 47)
Acyclic communication (Page 117)
Application Examples (Page 279)
Function overview
Functions (Page 147)
Vue de la page 4
1 2 3 4 5 6 7 8 9 10 ... 303 304

Commentaires sur ces manuels

Pas de commentaire