Installing
3.3 Installing the Power Module
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2011, FW 4.4, A5E02299792B AB
39
All cables should be kept as short as possible
Signal and data cables and the associated equipotential bonding cables must always be
routed in parallel with the smallest possible clearance between them
Shielded motor cables must be used
The shielded motor cable should be routed separately away from the cables to the motor
temperature sensors (PTC/KTY)
Signal and data cables must be shielded.
Especially sensitive control cables - such as setpoint and actual value cables - should be
routed without any interruption with optimum shield support at both ends
Shields should be connected at both ends to the grounded enclosures through a good
electrical connection and through a large surface area
Cable shields should be connected as close as possible to where the cable enters the
cabinet
EMC shield bars should be used for power cables; the shield support elements provided
in the inverter should be used for signal and data cables
If at all possible, cable shields should not be interrupted by intermediate terminals
Cable shields should be retained both for power cables as well as for signal and data
cables using the appropriate EMC clamps. The shield clamps must connect the shield to
the EMC shield bar or the shield support element for control cables through a low
inductive connection through a large surface area.
8QFRYHU
FDEOH
VFUHHQ
3UHVVFDEOH
VFUHHQRQ
VKLHOGSODWH
$
$
Figure 3-5 Shield support