Siemens 270 series Instructions d'exploitation Page 57

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 274
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 56
Installation and connection
4.4 Switch on and test the HMI device
TP 270, OP 270, MP 270B (WinCC flexible)
Operating Instructions, Edition 03/2004, 6AV6691-1DD01-0AB0
4-19
Function test
Initiate a function test following commissioning. The HMI device is functional when one of the
following conditions occurs:
The "Transfer" dialog is displayed
The loader is displayed
A project is started
Switching off the HMI device
Switch off the HMI device in the following ways:
Switch off the power supply, or
Unplug the terminal strip from the HMI device
Note
If a project is already running on the HMI device, runtime must be terminated before
switching the HMI device off.
Use the operating element provided by the project engineer.
Vue de la page 56
1 2 ... 52 53 54 55 56 57 58 59 60 61 62 ... 273 274

Commentaires sur ces manuels

Pas de commentaire