Data Hiway Connections, Continued
Instructions,
continued
Step Action
3. Connect the Channel A Data Hiway cable to port 1, ADH +
and - terminals. Repeat for port 2 for Channel B Data
Hiway Cable.
Data Hiway Port 1 &
2 Connections
Pin 1-ADH-A+
Pin 2-ADH-A-
Pin 3- Ground
Pin 4-ADH-B+
Pin 5-ADH-B-
Pin 6- Ground
Pin 1
Advance Data Hiway cable shields should be grounded
only at one end. If ground is at ANG_EN end, use GND
terminal.
4. Perform Data Hiway Post Installation Test; refer to
Appendix A. How to Test the Data Hiway.
5. Remove the ADH plug connector from board. Do not make
final connections until you have set the loop and unit
number; see Chapter 3. Data Communications Setup.
6. You are now ready for the Ethernet connections; go to
Ethernet Connections, page
23.
22 Installation 2000590-001