6-1
Distributed I/O Device ET 200M
EWA-4NEB780600602-06
Commissioning and Diagnostics
Chapter Overview
Section Subject Page
6.1 Commissioning and Startup of the DP Slave 6-1
6.2 Diagnostics Using LEDs 6-10
6.3 Diagnostics Using STEP 7 and STEP 5 6-13
6.4 Structure of the Diagnosis 6-16
6.1 Commissioning and Startup of the DP Slave
This section describes the prerequisites for commissioning and the few steps that
need to be taken to commission the ET 200M.
The startup of the ET 200M depends on which IM 153-x with which functionality
you use.
Section Subject Page
6.1.1 Prerequisites for Commissioning 6-2
6.1.2 Startup of the IM 153-1 6-4
6.1.3 Startup of the IM 153-2/153-2 FO 6-5
6.1.4 PROFIBUS-DPV1 Mode 6-8