T400 Controller Facilities Manual
667/EB/20200/000 Page 8-2 Issue 9
Figure 8.1 - DELAY PHASE LOSING RIGHT-OF-WAY
GREEN......GREEN
A
AMBER
AMBER
B
R/A
R/A
E
F
...Stage 1 Stage 2...(interstage - 6s)
Phase B is delayed by 1 second.
Intergreen from Phase A to Phases E and F is 5 seconds.
Intergreen from Phase B to Phases E and F is 5 seconds.
(a)
A
AMBER
AMBER
B
R/A
R/A
E
F
...Stage 1 Stage 2...(interstage - 5s)
Phase B is delayed by 1 second.
Intergreen from Phase A to Phases E and F is 5 seconds.
Intergreen from Phase B to Phases E and F is 4 seconds.
(b)
AMBER R/A
Key:-
...RED...