Siemens SPARC M8000 Spécifications

Naviguer en ligne ou télécharger Spécifications pour Serveurs Siemens SPARC M8000. Siemens SPARC M8000 Specifications Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 100
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs

Résumé du contenu

Page 1 - SPARC Enterprise

Site Planning GuideSPARC Enterprise M8000 / M9000 Servers English

Page 2

viii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007

Page 3 - Site Planning Guide

Herausgegeben von / Published byFujitsu Siemens Computers GmbH*U41685-J-Z816-2-76 *U41685-J-Z816-2-76 Bestell-Nr./ Order No.:U41685-J-Z816-2-76

Page 4

ixFiguresFIGURE 1-1 SPARC Enterprise M8000 Server 1–6FIGURE 1-2 SPARC Enterprise M8000 Server + Power Cabinet 1–7FIGURE 1-3 SPARC Enterprise M9

Page 5

x SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007 FIGURE 1-18 SPARC Enterprise M8000 Server + Power Cabinet Bottom View

Page 6

xiTablesTABLE 1-1 Checklist 1–1TABLE 1-2 Names and Quantities 1–4TABLE 1-3 Installation Specifications (External Dimensions and Weights) 1–5TA

Page 7 - Contents

xii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007

Page 8

xiiiPrefaceThe SPARC® Enterprise M8000/M9000 server installation planning manual provides the physical system specifications for this type of server

Page 9 - Index Index–1

xiv SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007 Chapter 2 Environmental and Electrical SpecificationsThis chapter des

Page 10

Preface xvNote – “x” in the order number is the version number of the manual.1. Manuals on the WebThe latest versions of all the SPARC Enterprise Ser

Page 11

xvi SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Text ConventionsThis manual uses the following fonts and symbols to expr

Page 12

Preface xviiPrompt NotationsThe following prompt notations are used in this manual.Syntax of the Command Line Interface (CLI)The command syntax is as

Page 14

xviii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Environment Requirements for Using This ProductThis product is a compu

Page 15

Preface xixConventions for Alert MessagesThis manual uses the following conventions to show alert messages, which are intended to prevent injury to t

Page 16 - Servers Documentation

xx SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Notes on SafetyImportant Alert MessagesThis manual provides the following

Page 17 - Preface xv

Preface xxiCaution – The CAUTION signal indicates a hazardous situation could result in minor or moderate personal injury if the user does not perfor

Page 18 - Text Conventions

xxii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Normal operationData destructionConfirm the items listed below before t

Page 19 - Prompt Notations

Preface xxiiiAlert LabelsThe labels shown below are affixed on this product. These labels provide information for users of the product:Caution – Do

Page 20 - This Product

xxiv SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007 SPARC Enterprise M9000 Server SPARC Enterprise M9000 Server (Front Vi

Page 21 - Alert messages in the text

Preface xxv SPARC Enterprise M9000 Server (Rear View)

Page 22 - Notes on Safety

xxvi SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007 SPARC Enterprise M9000 Server with Expansion Cabinet (Rear View)

Page 23 - Preface xxi

Preface xxviiProduct HandlingMaintenanceCaution – Certain tasks in this manual should only be performed by a certified service engineer. User must no

Page 24 - Task Warning

SPARC® Enterprise M8000/M9000 Servers Site Planning Guide Order No. U41685-J-Z816-2-76 Part No. 819-7885-11September 2007, Revision A

Page 25 - Alert Labels

xxviii SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Emission of Laser Beam (Invisible)Caution – The main unit and high-sp

Page 26 - SPARC Enterprise M9000 Server

Preface xxixReader's Comment Form

Page 27 - Preface xxv

xxx SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007FOLD AND TAPEFOLD AND TAPEBUSINESS REPLY MAILFIRST-CLASS MAIL PERMIT NO

Page 28

1-1CHAPTER1Physical and Network SpecificationsThis chapter describes what the reader is expected to know, including physical and network connection sp

Page 29 - Remodeling/Rebuilding

1-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Physical specifications Has the server installation location been deci

Page 30 - Your Comments

Chapter 1 Physical and Network Specifications 1-3Facility power Do you know the required operating voltages and electrical current levels of the d

Page 31 - Reader's Comment Form

1-4 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2 Physical SpecificationsThis section outlines the SPARC Enterprise

Page 32 - BUSINESS REPLY MAIL

Chapter 1 Physical and Network Specifications 1-51.2.1.2 External Dimensions and WeightsTABLE 1-3 lists the external dimensions and weights of th

Page 33 - Specifications

1-6 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2.1.3 System AppearanceFIGURE 1-1 to FIGURE 1-6 show the appearanc

Page 34 - Checklist (2 of 3)

Chapter 1 Physical and Network Specifications 1-7FIGURE 1-2 SPARC Enterprise M8000 Server + Power CabinetFront Rear

Page 35 - Checklist (3 of 3)

PleaseRecycleCopyright 2007 FUJITSU LIMITED, 1-1, Kamikodanaka 4-chome, Nakahara-ku, Kawasaki-shi, Kanagawa-ken 211-8588, Japan. All rights reserved.S

Page 36 - 1.2 Physical Specifications

1-8 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007SPARC Enterprise M9000 Server AppearanceFIGURE 1-3 SPARC Enterprise

Page 37 - M8000/M9000 server cabinet

Chapter 1 Physical and Network Specifications 1-9FIGURE 1-4 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cabinet)Front Rear

Page 38 - 1.2.1.3 System Appearance

1-10 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007FIGURE 1-5 SPARC Enterprise M9000 Server (Base Cabinet + Power Cabi

Page 39 - Front Rear

Chapter 1 Physical and Network Specifications 1-11FIGURE 1-6 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cabinet + Power Cabinet)Fro

Page 40

1-12 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2.2 System Installation (Space)1.2.2.1 Size and Space Specification

Page 41

Chapter 1 Physical and Network Specifications 1-13FIGURE 1-8 SPARC Enterprise M8000 Server + Power Cabinet Installation AreaNote – Before mounti

Page 42

1-14 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007FIGURE 1-9 SPARC Enterprise M8000 Server (With an Equipment Rack) I

Page 43

Chapter 1 Physical and Network Specifications 1-15FIGURE 1-10 SPARC Enterprise M8000 Server (With an Equipment Rack) + Power Cabinet Installatio

Page 44 - FIGURE 1-7 to

1-16 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007FIGURE 1-11 SPARC Enterprise M8000 Server (With an Equipment Rack)

Page 45

Chapter 1 Physical and Network Specifications 1-17FIGURE 1-12 SPARC Enterprise M8000 Server (With an Equipment Rack) + Power Cabinet Installatio

Page 46

Copyright 2007 FUJITSU LIMITED, 1-1, Kamikodanaka 4-chome, Nakahara-ku, Kawasaki-shi, Kanagawa-ken 211-8588, Japon. Tous droits réservés.Entrée et rev

Page 47 - Installation Area

1-18 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007SPARC Enterprise M9000 Server Installation AreaFIGURE 1-13 SPARC En

Page 48

Chapter 1 Physical and Network Specifications 1-19FIGURE 1-14 SPARC Enterprise M9000 Server (Base Cabinet) + Power Cabinet Installation AreaServ

Page 49

1-20 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007FIGURE 1-15 SPARC Enterprise M9000 Server (Base Cabinet + Expansion

Page 50

Chapter 1 Physical and Network Specifications 1-21FIGURE 1-16 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cabinet) + Power Cabinet I

Page 51

1-22 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2.2.2 Bottom Views of the ComponentsFIGURE 1-17 to FIGURE 1-22 sh

Page 52

Chapter 1 Physical and Network Specifications 1-23FIGURE 1-18 SPARC Enterprise M8000 Server + Power Cabinet Bottom ViewUnit: mm (inch)CasterFee

Page 53

1-24 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007SPARC Enterprise M9000 Server Bottom ViewFIGURE 1-19 SPARC Enterpri

Page 54

Chapter 1 Physical and Network Specifications 1-25FIGURE 1-20 SPARC Enterprise M9000 Server (Base Cabinet) + Power Cabinet Bottom ViewUnit: mm

Page 55

1-26 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007FIGURE 1-21 SPARC Enterprise M9000 Server (Base Cabinet + Expansion

Page 56

Chapter 1 Physical and Network Specifications 1-27FIGURE 1-22 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cabinet) + Power Cabinet B

Page 58

1-28 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2.2.3 Free-Access Floor Openings for Underfloor Air-ConditioningUse

Page 59

Chapter 1 Physical and Network Specifications 1-29FIGURE 1-24 SPARC Enterprise M9000 Server (Base Cabinet + Expansion Cabinet) + Power Cabinet B

Page 60

1-30 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2.3 Planning Your Access RouteThis section describes necessary cons

Page 61 - 1.2.2.4 Ceiling Height

Chapter 1 Physical and Network Specifications 1-311.2.3.2 Other ConsiderationsConfirm that the access route is free of any steps and other obstacl

Page 62 - TABLE 1-4

1-32 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Method of Securing the Device To the Floor Surface(Example of securin

Page 63 - 1.2.3.2 Other Considerations

Chapter 1 Physical and Network Specifications 1-33Method of Securing the Device Through a Hole in the FloorFIGURE 1-26 Cabinet Stabilization Mea

Page 64 - Fixing bracket

1-34 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2.5.2 Platform and Domain Setup InformationThe following informatio

Page 65 - ■ Monitoring the boot process

Chapter 1 Physical and Network Specifications 1-35XSCF Configuration A (Basic Configuration)Only one of the two LAN ports is used. The serial port

Page 66

1-36 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007XSCF Configuration B (Restricted Configuration)(Restricted redundancy

Page 67

Chapter 1 Physical and Network Specifications 1-37XSCF Configuration C (Maximum Configuration)(Maximum redundancy) - Both LAN ports are used. Each

Page 68

vContentsPreface xiii1. Physical and Network Specifications 1–11.1 Before Setting Up the System 1–11.2 Physical Specifications 1–41.2.1 System C

Page 69

1-38 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2.5.4 Interface Cable ConnectionsSPARC Enterprise Server Connection

Page 70

2-1CHAPTER2Environmental and Electrical SpecificationsThis chapter explains environmental and electrical power supply specifications and conditions ne

Page 71 - Environmental and Electrical

2-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20072.1.2 Recommended Ambient Temperature and HumidityKeep the temperature

Page 72 - Humidity

Chapter 2 Environmental and Electrical Specifications 2-3Air conditioning facilities usually do not provide functions to precisely monitor and con

Page 73

2-4 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20072.1.3 Vibration RequirementsThe allowable vibration in the SPARC Enter

Page 74 - 2.2 Electrical Specifications

Chapter 2 Environmental and Electrical Specifications 2-52.2.1 Single-Phase Power SuppliesTABLE 2-4 Specifications (Single-Phase Power Requireme

Page 75

2-6 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Power Cabinet SPARC Enterprise M9000 Server (base cabinet + expansion

Page 76

Chapter 2 Environmental and Electrical Specifications 2-72.2.2 Three-Phase Delta Power SuppliesTABLE 2-5 Specifications (Three-Phase Delta Power

Page 77

2-8 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20072.2.3 Three-Phase Star Power Supplies2.3 Cooling Specifications2.3.1 C

Page 78 - 2.3 Cooling Specifications

Chapter 2 Environmental and Electrical Specifications 2-92.3.2 Airflow and Heat DissipationSince the SPARC Enterprise M8000/M9000 Server is design

Page 79

vi SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20071.2.5.1 Setup and Network Connections 1–331.2.5.2 Platform and Domain

Page 80

2-10 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007 The SPARC Enterprise M9000 Server uses internal fans in the base ca

Page 81

Chapter 2 Environmental and Electrical Specifications 2-11 The SPARC Enterprise M9000 Server draws air from the bottom of the cabinet and exhaust

Page 82 - 2.4.1 Power Supply to Devices

2-12 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20072.4 Facility Power RequirementsThis section describes the power suppl

Page 83

Chapter 2 Environmental and Electrical Specifications 2-13Note – To connect power cables for this system directly to your power distribution board

Page 84

2-14 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 20072.4.1.2 Power Cable Connection SpecificationsTABLE 2-8 lists specifi

Page 85

Chapter 2 Environmental and Electrical Specifications 2-15SPARC Enterprise M9000 ServerJapan 3.0m (9.8 feet)30A-250V 3P, locking type (NEMA L6-30

Page 86

2-16 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007SPARC Enterprise M9000 ServerEurope 3.0m (9.8 feet)EN60309 (32A) (Bas

Page 87 - Dual power feed

Chapter 2 Environmental and Electrical Specifications 2-172.4.1.3 Three-Phase Power SupplyFIGURE 2-6 Three-Phase Delta Power Supply ConnectionsN

Page 88

2-18 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Power Cable Connection SpecificationsPart of the local electrical wor

Page 89 - Power Cabinet

Chapter 2 Environmental and Electrical Specifications 2-192.4.1.4 Three-Phase Star Power SupplyFIGURE 2-8 Three-Phase Star Power Supply Connecti

Page 90

Contents viiAbbreviations Abbreviations–1Index Index–1

Page 91 - FIGURE 2-10

2-20 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007Power Cable Connection SpecificationsPart of the local electrical wor

Page 92 - Operating time

Chapter 2 Environmental and Electrical Specifications 2-212.4.2 Circuit Breaker Capacity and CharacteristicsAs a condition for maintaining the lin

Page 93 - 2.4.3 Grounding

2-22 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007FIGURE 2-10 Circuit Breaker Characteristics of Customers' Powe

Page 94

Chapter 2 Environmental and Electrical Specifications 2-232.4.3 GroundingGrounding for Single-phase Power SupplySPARC Enterprise M8000/M9000 serve

Page 95 - Abbreviations

2-24 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007

Page 96

Abbreviations-1CHAPTERAbbreviationsAACS AC SectionACSTPH ACS Three-PhaseBBP BackplaneBUI Browser User InterfaceCCMB CPU Memory BoardCMU CPU/Memo

Page 97 - Index-1

Abbreviations-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007PPCICS PCI CassettePCI-ES PCI-Express ShortPFC Power Fa

Page 98

Index-1IndexCcabinet stabilization measures, 1-31circuit breaker capacity and characteristics, 2-19blockade character of circuit breaker, 2-1

Page 99

Index-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007

Commentaires sur ces manuels

Pas de commentaire