Siemens TL.. Instructions d'exploitation Page 53

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 61
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 52
Installation
4.3 Electrical installation
53
AC auxiliary power (self/external supply)
The SINVERT 350/420 inverters have a self-supply option (delivery state).
The jumpers on the terminal strip –OPT are set as shown.
With an external supply, the jumpers must be re-set at the terminal strip:
From terminal strip-OPT To terminal strip-OPT
101-102 102-103
104-105 105-106
107-108 108-109
110-111 111-112
Jumpers
Figure 4-13 Position of the terminal strip-OPT in the SINVERT 350/420
With external supply, connect the AC cable (3~ 400 V AC, neutral and PE) with the terminal strip –OPT:
L1 to 103
L2 to 106
L3 to 109
N to 112
PE to 113
Only external supply is possible in the SINVERT 500 TL.
External supply connector panel
Vue de la page 52
1 2 ... 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Commentaires sur ces manuels

Pas de commentaire