SQM5… Reversing Actuators Technical Instructions
155-517P25
Rev. 1, July, 2000
Siemens Building Technologies, Inc. Page 19
AGA56.41/42/43
Circuit Board
Installation, continued
9. Make the following connections to the
actuator: See Figure 22.
a. Connect the black wire, marked 1”
from the circuit board to switch I,
terminal 1.
b. Connect the yellow wire, marked
“2” from the circuit board to switch
II, terminal 2.
c. Connect the white wire, marked “3”
from the circuit board to switch III,
terminal 3.
d. Connect the brown wire, marked
“13” from the circuit board to
switch III, terminal 13.
e. Connect the other end of the blue
neutral wire to the double terminal
block located on the outer end of
the switch housing
f. Connect the gray grounding wire
marked "51" to the ground terminal
located to the right of the
auto/manual switch.
EA0577R2
2
51
N
13
3
1
0
MAN.
AUTO
I
11
21
12
22
12
II
3
23
13
III
4
24
14
IV
5
25
15
V
6
26
16
VI
7
27
17
VII
8
28
18
VIII
TERMINAL
BLOCK
N
Figure 22.
AGA56.9A
Circuit Board Installation
1. Remove the ASZ... potentiometer if
already installed on the SQM5...
actuator. See
Potentiometer
Removal/Installation Instructions.
2. Remove the AGA56.9A… circuit
boards from the packaging. The three
separate AGA56.9A circuit boards are
shipped in a circuit board mounting
bracket.
3. Remove the two upright circuit boards
from the mounting bracket by gently
pulling aside the vertical supports and
sliding the boards upward. Remove the
base circuit board from the bottom of
the mounting bracket. Discard the
shipping mounting bracket.